Skip to Content
CO2 Performance LadderSupply chain analysis

Supply chain analysis for the CO2 Performance Ladder with an example

A supply chain analysis is a calculation of the CO2 emissions in one chain that your organisation is part of, along with the reduction opportunities you can use there together with chain partners. For the CO2 Performance Ladder, the supply chain analysis is mandatory from level 4 (handbook 3.1). In handbook 4.0 it is called value chain analysis and belongs to tiers 2 and 3. The analysis covers scope 3 emissions and follows the method of the GHG Protocol . Below you can read how to choose a topic and see a worked example, based on the Practical Guide from SKAO (the Dutch foundation that manages the CO2 Performance Ladder) .

Short answer: under handbook 3.1, you make two supply chain analyses for level 4: one on an emission from the top 2 and one from the top 6 of your ranking of the most material scope 3 emissions. Small organisations make one, from the top 2. Under handbook 4.0, the number depends on your main activities, which together cover 50% of your total emissions.

On this page

What does the CO2 Performance Ladder require for the supply chain analysis?

The requirements differ per handbook. During the transition period, both versions exist side by side. See levels and tiers. New audits under 3.1 are possible until 14 January 2027. Under handbook 3.1, the supply chain analysis belongs to level 4, with two analyses and a reduction target for the chain. See CO2 Performance Ladder level 4 for the requirements in detail.

ItemHandbook 3.1 (level 4, requirement 4.A.1)Handbook 4.0 (tiers 2 and 3)
NameSupply chain analysisValue chain analysis
Basis for the choiceRanking of the most material scope 3 emissions (PMC analysis)Breakdown into activities across scope 1, 2 and 3
Number2 analyses: one from the top 2, one from the top 6. Small organisations: 1 from the top 2As many as needed to cover the main activities (50% of total emissions)
External reviewA knowledge institute supports or comments on at least 1 analysis (requirement 4.A.3). Mandatory for small organisationsProfessional commentary no longer mandatory
Time horizonShort-term reduction opportunitiesMedium-term as well, and long-term at tier 3
Follow-upScope 3 target per supply chain analysis (4.B.1)Targets in the climate transition plan

Sources: Practical Guide part 2  and the change list 4.0 versus 3.1 from SKAO . Under 3.1, whether you are small, medium or large depends on your scope 1 and 2 emissions. Under 4.0, you look at FTEs, turnover and balance sheet total, just as with the CSRD (Corporate Sustainability Reporting Directive).

Choosing the topic: the ranking of most material emissions

Before you make a supply chain analysis, decide which scope 3 emissions matter most. Material here means: large and influenceable. The Practical Guide gives six steps.

  1. Make a list of your activities, for example roads, bridges and sewerage.
  2. Identify the relevant scope 3 categories per activity, such as purchased materials or transport by third parties.
  3. Estimate the size of each emission: large, medium, small or negligible.
  4. Estimate your influence: what can measures achieve? Use the same scale.
  5. Determine your market share or turnover per activity. The larger it is, the more influence you have.
  6. Rank the emissions based on steps 3, 4 and 5.

Example ranking for a civil engineering (GWW) company

GWW stands for grond-, weg- en waterbouw (civil engineering: earthworks, roads and hydraulic works).

RankEmissionSizeInfluenceExplanation
1Purchase of concrete pavingLargeMediumLarge volumes, lower-cement alternatives available
2Purchased earthmovingLargeMediumSubcontractors with their own equipment
3Purchase of raw materials (sand, gravel)MediumMediumTransport distance plays a role
4Use of roadsLargeSmallTraffic itself is hardly influenceable
5Construction waste processingMediumMediumReuse possible
6Transport of purchased materialsMediumSmallDepends on the supplier

This company chooses concrete paving (top 2) and waste processing (top 6) for its two supply chain analyses. The example emissions come from the SKAO Practical Guide. The assessment itself is fictional.

Do not choose the topic that is easiest to calculate. The auditor checks whether your choice follows logically from your ranking. A supply chain analysis on office paper for a road builder fails immediately.

Example supply chain analysis: concrete paving

A supply chain analysis follows a fixed structure. Below are the main points of a fictional analysis. The figures are illustrative. In a real analysis, you use supplier data, the Dutch National Environmental Database (Nationale Milieudatabase) or life cycle assessments (LCAs).

1. Define the boundaries

ItemContent
ChainConcrete paving blocks and slabs, from cement production to demolition
Functional unit1,000 m² of paving laid per year
Volume40,000 m² per year
Chain partnersCement producer, concrete products factory, transporter, own construction team, processor

2. Supply chain steps and emissions

Supply chain stepWhoEmissions per 1,000 m² (tonnes CO2e)Share
Production of cementCement producer14.070%
Production of paving blocksConcrete products factory2.412%
Transport to projectTransporter1.68%
LayingOwn construction team (scope 1)1.26%
Demolition and processingProcessor0.84%
Total20.0100%

At 40,000 m² per year, that is 800 tonnes CO2e in this example. Well over two thirds comes from cement production.

3. Reduction opportunities

MeasureChain partnerEstimated effectFeasibility
Paving blocks with less cement or alternative bindersConcrete products factory-25% on productionMedium, the supplier has the product
Reuse of existing blocks during redevelopmentOwn projects-30% on the reused partHigh, requires agreements with the client
Transport with electric trucksTransporter-60% on transportLow to medium

4. Target and follow-up

Based on the analysis, the company sets a scope 3 target: “By 2028, CO2 emissions per 1,000 m² of paving laid are 20% lower than in 2025, through purchasing low-cement blocks and reuse.” Progress is recorded in the progress report, and the company starts talks with two suppliers.

What does the auditor want to see in the supply chain analysis?

What the auditor checksEvidence
Is the choice substantiated?Ranking or activity analysis with size and influence
Is the chain fully described?Supply chain steps, partners and boundaries
Are the figures traceable?Sources, emission factors, assumptions, calculation
Have reduction opportunities been identified?Measures with effect and chain partner
Does it lead to a target?Scope 3 target and progress
Under 3.1: is there an external review?Commentary or support from a knowledge institute
Is it published?Analysis and ranking on the website or the SKAO platform

Common mistakes in the supply chain analysis

  • Calculating only, no opportunities. The analysis is meant to find reductions. Without measures and a target, it is not finished.
  • No chain partners involved. The best data and the biggest reductions come from suppliers.
  • Never updated. Under 4.0, you review at least once every three years whether the analysis needs updating.

Next step

See what level 5 adds on top of the supply chain analysis, or start at the basics with scope 1, 2 and 3. Want to know how the supply chain analysis fits into your evidence file? See the audit checklist. In ISO 14001, the same thinking is called the life cycle perspective.

Sources