Decomposition under NEN 2767: what it is and why it matters
Decomposition means dividing a building into parts, so that you can measure each part separately. In the NEN 2767 standard , those parts are called elements and building components. Without decomposition, you get one score for the whole building, and that says little about what needs repairing.
For buildings, the standard decomposes the building into elements, building components and material types. The type of object is recorded in the passport (the object passport). You can read more about the measurement itself on NEN 2767 explained. For infrastructure, you use a different breakdown, which is set out in NEN 2767-4 infrastructure.
Fictional example: the VvE Parkzicht owners’ association has one building with 48 apartments. The board has the building measured as one object. It receives a score of 4, but nobody knows whether the facade, the roof or the lifts are the problem. That is why the board has the building divided into elements.
On this page
Below, you will find the terms: object, element and building component. After that comes an example of a building broken down into elements, and how the breakdown affects the scores and the MJOP.
Object, element and building component, and how they relate to each other.
The concepts at a glanceA worked example with facade, roof and installations.
A building in elementsWhy the size of the parts matters.
What the breakdown does to scores and the MJOPThe concepts at a glance
A decomposition works from large to small. Below are the three terms you will meet most often.
| Term | What it is | Example for a building |
|---|---|---|
| Object | The whole that you measure | The entire building or complex |
| Element | A maintenance-sensitive part of the building | Facade, roof, lifts or the central heating installation |
| Building component | A part of an element that you assess separately | Pointing, roof covering or a window frame |
An element consists of building components, and sometimes of sub-components. A facade, for example, consists of facade cladding, window frames and pointing. Each building component gets its own condition score.
What exactly an element is appears on the element list. That list gives the standard names the standard uses. Use those names, so that your measurement stays comparable with other measurements.
Decomposition is the breakdown, condition measurement is the assessment. First you divide the building, then you give each part a score.
A building in elements
Below is how an inspector can divide a building belonging to VvE Parkzicht. The breakdown is fictional, but the terms come from the standard.
Define the object
The object is the whole building, including its entrance and the shared spaces. This is the unit you add up later.
Divide the building into elements
The building gets the elements facade, roof, lifts, installations and foundations. Each element is a part that needs maintenance.
Split the elements into building components
The facade gets facade cladding, window frames and pointing. The roof gets roof covering and gutters. The central heating installation gets the boiler, the pipes and the radiators.
Measure each building component
For each building component, the inspector gives a score. For example, the pointing gets a 4, the window frames a 2 and the roof covering a 5.
| Element | Building component | Score | Intervention in the MJOP |
|---|---|---|---|
| Facade | Pointing | 4 | Repointing in year 2 |
| Facade | Window frames | 2 | No intervention needed now |
| Roof | Roof covering | 5 | Replacement in year 3 |
| Installations | Boiler | 3 | Replacement after year 8 |
The object has one score, but that score is the result of all the building components together. That is why you can only plan a specific intervention if you measure the building components separately.
What the breakdown does to scores and the MJOP
The size of the parts determines how precise your plan is. The finer the decomposition, the better you can see where things go wrong. A facade with good window frames and poor pointing receives an average verdict in one score. With building components, you see the difference.
This carries through to the MJOP (multi-year maintenance plan). Each building component gets its own intervention, its own year and its own amount. The roof of Parkzicht therefore appears in the schedule for year 3, and the pointing for year 2. Had the board measured only the facade as a whole, it would not have seen that the pointing is due before the window frames. See how that ends up in the plan on MJOP based on NEN 2767.
A decomposition that is too fine also has drawbacks. Each building component takes inspection time and adds an extra line to the records. For a small building with one roof and one facade, a coarse breakdown is often sufficient. Ask your inspector which level suits your object, and why.
The decomposition is not only for the inspector. It is also the basis of your planning. If you change the breakdown later, old and new scores no longer match.
For infrastructure, the breakdown works differently. See NEN 2767-4 infrastructure.
Frequently asked questions
Who makes the decomposition?
The inspector draws up the decomposition, in consultation with the client. The manager or the board decides which level suits the planning. Record the choice in the report, so that later measurements follow the same breakdown.
Must the decomposition be the same every year?
Yes, if you want to compare scores. A new breakdown makes old and new scores hard to compare. Change the breakdown only when the building really changes, for example after a renovation.
Is a decomposition the same as an element list?
No. The element list is the standard list of names of elements and building components from the standard. The decomposition is the application of that list to your building. You use the element list to draw up the decomposition.
Further reading
- Element list: the standard names of elements and building components
- Defects: what you assess per building component
- MJOP based on NEN 2767: how the scores end up in the plan