Skip to Content
HACCPUpdating the plan

When do you update your HACCP plan?

You update your HACCP plan as soon as reality no longer matches it. Examples are a new product, different equipment or a complaint that shows a risk is not properly controlled. HACCP stands for Hazard Analysis and Critical Control Points. Article 5 of Regulation 852/2004  states that you must review and adapt the procedure when you change the product, the process or a step in it, and that the documents must always be up to date. The NVWA (Netherlands Food and Consumer Product Safety Authority)  puts it this way: “Check regularly whether your HACCP approach is effective.” The sixth of the 7 HACCP principles, verification, is the basis for this.

A HACCP plan that has not been updated for five years, while the menu has changed, is in practice out of date. Such a plan quickly stands out during an inspection.

What does the NVWA say about this?

The law gives one clear trigger: a change in product, process or step (Article 5 of Regulation 852/2004). Neither the regulation nor the NVWA page names a fixed period or a list of cases. That is why it is sensible to put a clear agreement in your own plan: which events lead to a review, and who decides.

The seventh principle also requires you to record what you do. A change without a note is, in practice, a step backwards. See documentation and record keeping in the 7 principles for the background. How long you keep old versions and records is set out on how long to keep HACCP records.

Events that require a review

The list below is a practical working-out of that trigger, not a legal list. Include the situations that are relevant to your business.

SituationWhat must changeExample
New product or new dishHazard analysis and, if needed, CCPsA raw fish special on the menu
New equipmentLimit values and monitoringA different cold room or combi oven
Renovation or new layoutProcess flow diagram and separationA separate route for dirty and clean
New supplier with a different productGoods-in check and hazard analysisA different meat supplier with different packaging
Complaint or incidentRoot cause analysis and, if needed, an extra CCPA customer ill after a cold buffet
Deviation during a checkCorrective action and tighter monitoringCold room above the limit value several times
Change to the hygiene codeMove to the new versionNew version of the hospitality hygiene code
Change of staff or person in chargeUpdate the HACCP team and contact personsA new head chef

Note the last row. A plan that still names a former chef as the person in charge is a small error that raises a lot of questions.

Example of a change log

Record every change in a log with the plan. This does not need to be complicated.

VersionDateChangeReasonByApproved by
1.0March 2025First version, hazard analysis for the kitchenStart of HACCPOwnerOwner
1.1June 2025Addition of terrace service with a cold buffetNew productOwnerOwner
1.2October 2025Limit value for cold room 2 adjusted after a deviationComplaint and checkHead chefOwner
1.3March 2026New combi oven, core temperature adjustedEquipmentHead chefOwner

The version and the date should also appear on the front of the plan. An inspector looks there first.

How do you carry out a change?

A good review follows a fixed order. First, you describe what is changing and why. Then you check which hazards are new or are now assessed differently. Next, you adjust the CCPs, limit values and records. Finally, you record the new version and brief the staff.

Do not skip that last step. A new limit value that is on paper but unknown on the kitchen floor has not been implemented. An inspector will check this. For what you need to show, read NVWA inspection of HACCP.

Common mistakes

  • Making a change without updating the plan, so that the plan and the kitchen contradict each other
  • Lowering or raising a limit value without a justification
  • Not raising the version number, so it is not clear what differs between the old and new plan
  • Updating the plan only when an inspection is due. This looks like administration tidied up after the fact

Is an annual check enough?

A full annual review of the plan is a good safety net, but it is not enough if things change in between. Combine the annual check with a fixed trigger: every change to the menu, equipment, staff or suppliers counts as a reason to review. That keeps the plan up to date without a full review every month.

Further reading on your HACCP plan

Frequently asked questions about updating your plan

Do I have to update my plan for every small change?

No. A small adjustment, such as a new supplier for the same product, can go in the change log without a new hazard analysis. A new product or new equipment does require a fresh assessment.

What if the hygiene code for my sector changes?

Then you assess whether the change applies to your business. Adopt the new version and record in the log which parts you have adjusted.

Can I have an adviser check my plan?

Yes, and this is sensible for major changes. The responsibility stays with your business. An adviser helps with choosing limit values and CCPs, but the choices must match your actual process.

Sources