Skip to Content
ISO 50001For manufacturers

ISO 50001 for manufacturers

ISO 50001 certification is especially valuable for manufacturers. The manufacturing industry is energy-intensive, and the saving potential is large. Companies in metal, food, chemicals and plastics typically achieve 10-25% energy savings within 3 years with ISO 50001 . That translates directly into lower production costs. The NEN publication  describes the standard that provides the framework for this.

Manufacturers often have the highest ROI on ISO 50001. An implementation investment of €30k-€60k pays for itself within 1-2 years at an energy bill of €200k or more. See costs and timeline for details.

Why ISO 50001 specifically for manufacturers?

FactorExplanation
High energy consumptionTypically €100k-€1M+ per year in energy
Lots of saving potentialOld machines, leaks, suboptimal processes
EED obligationLarge manufacturers almost always fall under EED 2027
Customer pressureAutomotive, food and chemicals increasingly set sustainability requirements
SubsidiesEIA (Energie-investeringsaftrek, Energy Investment Allowance), SDE++ and ISDE make investments more profitable

Typical energy split in manufacturing

Before you start with ISO 50001, map your energy consumption through the energy review. A typical split is shown below.

System% of electricity consumption% of gas consumption
Compressors (compressed air)25-40%n/a
HVAC (climate control)10-25%40-60%
Production processes (ovens, presses, extruders)20-35%30-50%
Motors and pumps10-20%n/a
Lighting5-15%n/a
Office and IT3-8%n/a

Top 5 savings for manufacturers

1. Optimising compressed air

Compressed air is the most expensive form of energy in the factory. Only 10-15% of the electrical energy is converted into useful air pressure. The rest is heat.

MeasureSavingInvestmentPayback period
Leak detection and repair10-25% on compressed air€2k-€5k3-6 months
Lowering system pressure (8 to 7 bar)7-8% per bar€1k-€3kImmediate
Frequency inverter on compressor15-35%€15k-€40k2-3 years
Heat recovery from compressor50-80% of heat usable€5k-€15k1-2 years

Example: A metal company with 3 compressors (200 MWh per year). Leak detection saves 15% (30 MWh = €4,500 per year). Investment: €3,000. Payback period: 8 months.

2. Motors and drives

Electric motors consume 60-70% of industrial electricity. Many run at full power when the process does not require it.

MeasureSavingInvestmentPayback period
Frequency inverters (VFD) on pumps and ventilation20-40%€2k-€10k per motor1-3 years
IE3/IE4 motors on replacement3-5% per motorExtra cost €200-€1,0001-2 years
Belt drive replaced by direct coupling5-10%€500-€2,0001-2 years

3. HVAC and heating

Large production halls are difficult to heat. A lot of heat escapes through doors, roof and walls.

MeasureSavingInvestmentPayback period
Air curtains at loading doors50-80% of heat loss through the door€3k-€8k per door1-2 years
Zone control (do not heat the whole hall)15-30%€5k-€20k2-3 years
Radiant panels instead of air heating30-50%€10k-€30k3-5 years
Programming a night setback10-20%€1k-€5kUnder 1 year

4. Process optimisation

MeasureSavingInvestmentPayback period
Heat recovery from ovens15-30% on gas consumption€10k-€50k2-4 years
Insulation of pipes and ovens5-15%€2k-€10kUnder 1 year
Clustering production (not running spread out)5-15%€0 (organisational)Immediate
Switching off standby outside working hours5-10%€1k-€5k (timers, relays)Under 1 year

5. Lighting

MeasureSavingInvestmentPayback period
LED in the production hall50-70% on lighting€5k-€25k2-3 years
Motion sensors in the warehouse30-50%€1k-€5kUnder 1 year
Daylight control20-40%€2k-€8k2-3 years

EnPIs for manufacturers

For manufacturers, the EnPIs are almost always related to production output.

EnPIUnitTypical starting valueRealistic target (3 years)
Electricity per productkWh/unit5-50 kWh/unit-10 to -20%
Gas per productm³/unit0.5-5 m³/unit-10 to -15%
Compressed air per productm³ air/unit2-20 m³/unit-15 to -25%
Specific consumptionkWh/kg output0.1-10 kWh/kgDepends on sector
Total consumption per revenuekWh/€ revenueHighly variable-5 to -10%

You normalise the energy baseline for production volume. That way you compare efficiency regardless of whether you produce more or less.

Implementation approach for manufacturers

PhaseWhatDurationPoints of attention for production
1. PreparationCommitment, scope, team2-4 weeksInvolve the production manager and maintenance team
2. Energy reviewMap consumption4-8 weeksSubmetering on the top 5 consumers, link production data
3. Determine SEUsChoose focus areas2-3 weeksCompressors and HVAC are almost always SEUs
4. Baseline + EnPIsReference point2-3 weeksNormalise for production volume
5. Action plansPlan measures2-4 weeksStart with quick wins (leak detection, standby off)
6. ImplementationCarry out measuresOngoingCombine with planned maintenance
7. AuditCertification2-4 weeksMake sure operators know what an SEU is

More detail per phase: see the step-by-step plan.

Common mistakes with ISO 50001 for manufacturers

MistakeConsequenceSolution
Only analysing invoices, no submeteringYou do not know where the energy goesInvest in at least 5-10 submeters
Not linking production data to energy dataYou cannot calculate an EnPI per productConnect MES/ERP to energy monitoring
Focusing only on electricity, forgetting gasGas consumption (heating, ovens) stays a blind spotInclude all energy flows
Not involving the maintenance teamOperators do not follow energy-saving instructionsMake maintenance part of the energy team
Overly ambitious goals in year 1Frustration, loss of supportStart with a 10% target, raise it in year 2

More information